Yellow Line Metro Route Inaugurated – Full Stations List, Timings, and Benefits

On: Sunday, August 10, 2025 3:06 PM
Yellow Line Metro Route

Yellow Line Metro Route Inaugurated: Stations, Timings, and Key Benefits for Bengaluru

Bengaluru has taken a major leap forward in its public transport network with the official inauguration of the Yellow Line Metro Route. The much-awaited corridor, part of Namma Metro’s expansion plan, was launched by Prime Minister Narendra Modi on August 10, 2025, with commercial operations beginning August 11, 2025, at 5:00 AM.

The new line is expected to drastically reduce travel time, ease congestion on some of the city’s busiest roads, and connect important residential, commercial, and industrial hubs.


Yellow Line Metro RouteYellow Line Metro Route Overview

The Yellow Line stretches over 19 kilometers, linking RV Road (Ragigudda) in South Bengaluru to Bommasandra in the southeastern industrial corridor. The route includes 16 elevated stations, each strategically placed to maximize connectivity for commuters.

Key interchange points include:

  • RV Road Station – Connects with the Green Line

  • Jayadeva Hospital Station—A multi-level interchange with future metro lines

  • Central Silk Board Station – Major hub for commuters heading towards Electronics City and IT clusters

This new corridor not only connects residential neighborhoods with employment hubs but also bridges a gap in the city’s north-south connectivity.


 Complete List of Yellow Line Metro Stations

  1. RV Road (Ragigudda)

  2. Ragigudda

  3. Jayadeva Hospital

  4. BTM Layout

  5. Central Silk Board

  6. HSR Layout

  7. Bommanahalli

  8. Kudlu Gate

  9. Singasandra

  10. Hosa Road

  11. Electronic City Phase I

  12. Electronic City Phase II

  13. Hebbagodi

  14. Huskur Road

  15. Bommasandra

(Note: Station names are based on the latest official updates and may have minor adjustments over time.)


 Timings and Frequency

Initially, the Yellow Line Metro Route will operate from 5:00 AM to 11:00 PM, with trains running every 25 minutes. As passenger demand grows, Bengaluru Metro Rail Corporation Limited (BMRCL) is expected to increase frequency to 10–15 minutes during peak hours.

The opening phase will see three train sets in operation, gradually scaling up to full capacity over the next few months.


 Fare Structure

While exact fare tables vary based on travel distance, initial reports suggest the minimum ticket price will start at ₹10, with the maximum fare reaching around ₹55–₹60 for the full 19 km stretch. Smart card users will receive standard Namma Metro discounts.


 Why the Yellow Line Matters for Bengaluru

The Yellow Line Metro Route is more than just another addition to the city’s transport network—it’s a potential game-changer for thousands of daily commuters.

1. Reduced Travel Time

Before the Yellow Line, traveling from RV Road to Bommasandra during peak traffic could take 1.5 to 2 hours by road. With the metro, the journey will now take around 45 minutes.

2. Better Connectivity for IT & Industrial Hubs

Electronics City, home to some of the world’s biggest IT companies, will now be directly connected to residential zones, helping employees avoid traffic bottlenecks.

3. Environmental Benefits

With fewer cars on the road, the Yellow Line is expected to help lower Bengaluru’s carbon footprint by reducing fuel consumption and vehicular emissions.

4. Boost for Local Businesses

Increased footfall near metro stations is likely to benefit retail stores, eateries, and other businesses along the route.


Development Journey and Challenges

The Yellow Line project, costing an estimated ₹7,610 crore, took nearly eight years to complete. Construction faced delays due to land acquisition issues, shifting utility lines, and pandemic-related disruptions. However, the perseverance of the BMRCL and construction teams has brought the project to completion, promising long-term benefits for the city.


Yellow Line Metro RouteFuture Integration with Other Metro Lines

Once fully operational, the Yellow Line will integrate with Bengaluru’s broader metro network:

  • Green Line at RV Road

  • Pink Line (under construction) at Jayadeva Hospital

  • Blue Line at Central Silk Board (planned)

This interconnected network will give passengers more flexibility and fewer interchanges when traveling across the city.


 Public Response and Expectations

Commuters and city planners alike are optimistic about the Yellow Line’s potential. Office-goers working in Electronics City expect their commute to be stress-free and predictable, while residents along the route see property values and local development getting a significant boost.

Social media is already buzzing with photos from trial runs, station designs, and panoramic views from the elevated tracks.


Suggested Authoritative Source

For real-time schedules, fare updates, and official notifications, visit:
 BMRCL Official Website

Join WhatsApp

Join Now

Join Telegram

Join Now

1 thought on “Yellow Line Metro Route Inaugurated – Full Stations List, Timings, and Benefits”

Leave a Comment